Your privacy is very important to us. When you visit our website, please agree to the use of all cookies. For more information about personal data processing, please go to Privacy Policy.

Shenzhen-Zhongshan Link - Zhongshan Bridge

Share
  • Guangdong(China)
  • June 2024
  • Expansion Joints
  • Total Length: 24km

Positioned 30km south of Humen Bridge and 31km north of HZMB, this critical Pearl River Delta connector features a 1,170m cable-stayed bridge (580m main span) with 213.5m towers. Designed as eight-lane 100km/h expressway with Grade I loading.

Products Applied: RBQF1600 Unitized Multi-Directional Displacemnet Finger-shape Expansion Joints

解决方案-大跨径桥梁封面.jpg

Others

Get More Solutions